Features

Everything a contract manager needs, and nothing that guesses.

Verdue does one job: turn what your contractors did into evidence you can act on and hand over.

At a glance

Six things the portal does every day.

Live compliance map

Every park, reserve and corridor colour-coded by status. Filter by category, zone or contractor and see the whole LGA at once.

Boundary verification

A completion counts only when its GPS position falls inside the site polygon. The check is performed in PostGIS, not by ticking a box.

Monthly compliance reporting

Monthly compliance PDFs by contractor, category and zone, built to generate on a schedule.

Contractor management

Designed so each contractor sees only their own work, while you see all of it side by side against the schedule in their contract.

Resident issue register

Log a complaint against the site it concerns, with severity, category and photographs, and close it against the service that resolved it.

Chemical application records

Herbicide applications arrive with product, rate, weather and operator licence attached, so the EPA record sits in the same place.

The map

The whole LGA, in one view

The compliance map is the product’s home screen. Sites are shaded by status (current, due soon, overdue), so exceptions stand out. It is built on PostGIS geometry rather than map pins, so a road corridor is stored as a corridor and a reserve as its actual boundary.

  • Site boundaries imported from your existing GIS data
  • Colour-coded by maintenance status, live
  • Filter by category, zone, contractor or overdue-only
  • Click through to a site’s full service history
Compliance map
City Council · 214 sites · 4 contractors
186
Current
21
Due soon
7
Overdue
E G W Wood Sportsfield
Mown 2 days ago · Vantage Grounds
Current
Tarradarrapin Creek Wetlands
Slashing due in 3 days · Vantage Grounds
Due soon
Jacob Street Nature Belt
Overdue by 6 days · Coastline Veg
Overdue
Compliance map of a coastal council area: real streets and reserves with site boundaries shaded by maintenance status — a mown point reserve current, wetlands due for slashing, and a creek corridor overdue with a crew on site.
Sample data — an illustrative scenario, not a live feed
The evidence

Verified before it counts

When a contractor submits a completed service, Verdue checks the recorded position against the site polygon before the record is accepted. A job logged near the park does not mark the park as serviced. Photographs, timestamp, operator and service type travel with the record.

  • GPS position tested against the site boundary in PostGIS
  • Before and after photographs attached to the record
  • Service history kept for each site
  • Duplicate submissions detected and discarded
What a verified completion holds
Position
−27.4981, 153.2604 · ±4 m
Boundary test
Inside site polygon — verified
Recorded
14 June 2026, 07:42 AEST
Service
Mowing — Category A parks
Contractor
Vantage Grounds
Evidence
4 photographs · attached to record
The report

The report that settles what was done

Each month Verdue compiles every verified service into a single report, broken down the way your contract is written. It is built to generate on a schedule, with email delivery set up and tested as part of a live service, so the monthly compliance pack no longer has to be assembled by hand.

  • Broken down by contractor, category and zone
  • Every figure shown with its denominator
  • Scheduled generation, with email delivery set up for the live service
  • Exportable for insurance, audit and legal requests
Monthly compliance report — sampleCC-2026-06
City Council
Vegetation maintenance — June 2026
Generated 1 July 2026, 06:04 AEST
186
Services completed
4
Contractors
7
Sites overdue
Parks — Category A48 of 48 services
Reserves — Category B61 of 64 services
Road corridors77 of 81 services
Boundary-verified184 of 186 jobs

Every service in this report links back to the GPS position, timestamp and photographs captured on site.

Where the records come from

Your contractors keep their tools. You get the evidence either way.

The council portal is one half of Verdue; the other is the app contractors use in the field. Contractors already using it connect through a signed webhook, and contractors using nothing at all are not excluded from your contract.

  • Verdue for contractors: proof-of-service records arrive automatically over a signed webhook
  • Other software: submits through the same documented interface
  • No software: manual completion entry, set up during onboarding

See the demonstration, then talk through your own sites.